Traffic & Roads

SR 429 Traffic: New Overnight Lane Closure Tonight at Avalon Road, SR 528 Work Runs Through Friday

A new Central Florida Expressway Authority alert adds an overnight single-lane closure tonight on SR 429 at the Mainline Plaza and Avalon Road — with its title and text disagreeing on direction — while nightly SR 528 work toward Narcoossee Road runs through Friday.

3 minute read

ShareFacebookX

A driver setting out on the west side tonight will meet the week’s road work in a different order than the morning driver was led to expect. At the 16:15 check of the Central Florida Expressway Authority’s board, the Schofield Road item this desk has carried since Sunday was no longer listed. In its place stood a new overnight lane closure on SR 429 for tonight — one whose own official text disagrees on which direction is closing. Elsewhere across the week, the pattern holds a steadier shape: SR 528 work toward Narcoossee Road runs through Wednesday and Friday, and Division Avenue under SR 408 closes nightly through Friday. Standing coverage is in the Traffic & Roads archive and the beats index.

SR 429: a new overnight closure, direction as posted

The contradiction sits in plain sight inside the authority’s own posting. Its title announces a northbound SR 429 overnight lane closure for Tuesday, November 24 to Wednesday, November 25; its body schedules an overnight single lane closure for southbound SR 429 at the Mainline Plaza and Avalon Road / C.R. 545, between 9 p.m. and 5 a.m., for road work. Because the title and the body point in opposite directions, this desk reports the elements on which the alert is specific — the closure, the place and the hours — and flags the discrepancy rather than choosing a direction the source has left unsettled. Drivers on either carriageway at the Mainline Plaza and Avalon Road tonight should expect a single-lane closure as posted. As for the Schofield Road alternating single-lane alert carried in this morning’s final-night report, it does not appear among the authority’s seven current alerts at this check; its absence is noted strictly as a board fact, with no claim that the work is complete.

SR 528: the Narcoossee work continues

Along SR 528, by contrast, drivers meet an unchanged overnight schedule that holds through the week. An eastbound single-lane closure from Conway Road to Narcoossee Road / SR 15 runs nightly through Friday, November 27, between 8 p.m. and 7 a.m. Each night through Wednesday, November 25, the eastbound off-ramp to Narcoossee Road (Exit 13) also closes between 10 p.m. and 5 a.m., routing traffic onto the authority’s posted detour via northbound Goldenrod Road / SR 551 (Exit 12) to Lee Vista Boulevard and east to Narcoossee Road — the route serving the Lake Nona side of the corridor. Below the expressway, a nightly single-lane closure runs on northbound Narcoossee Road under the SR 528 overpass through Friday, November 27, between 9 p.m. and 5 a.m. Goldenrod Road’s Exit 12 carries no closure alert of its own, appearing only as the detour exit in the Exit 13 closure.

Under SR 408, and what is not posted

Beneath SR 408, the nightly shutdown takes in both street and sidewalk. Division Avenue under SR 408, along with southbound Division Avenue from Anderson Street to South Street, closes nightly as a full road and sidewalk closure through Friday, November 27, between 10 p.m. and 6 a.m. Daytime lane closures continue through Friday, from 7:30 a.m. to 4:30 p.m., on northbound Tampa Avenue from Gore Street to Central Boulevard and on Carter Street from Orange Blossom Trail / U.S. 441 to Hicks Avenue. What stays off the authority’s board is recorded with the same caution: no SR 408 mainline alert and no SR 417 construction alert appeared at this check, consistent with this morning’s board fact, and neither absence is reported as work completed. Tonight’s surface-road final night — Fairbanks Avenue, SR 436 and Sand Lake Road — was verified again at this check against FDOT District 5’s listings at the hours this morning’s report published, and last night’s toll-road set is in Monday’s night-work report.

Sources & notes: All toll-road items trace to the Central Florida Expressway Authority’s construction alerts at cfxway.com (For Travelers), all seven current alerts opened at the 16:15 check on Tuesday, November 24, 2026; the SR 429 alert’s title-versus-body direction conflict is disclosed in-story and no direction is asserted. The surface-road final-night verification traces to FDOT District 5 / CFLRoads lane-closure listings (Fairbanks Avenue project 451282-2, SR 436 project 450583-1, Sand Lake Road project 450638-1) checked the same afternoon. Each CFX alert carries the authority’s standing note that weather and other unforeseen circumstances could delay the work. No closure in this story comes from any source other than the official listings named.

Filed under · · · · ·

Editor’s Picks

  1. 1NewsEpic Universe Faces Its First Holiday Season
  2. 2ReviewsThe 10 Best Coffee Shops in Orlando
  3. 3TourismMagic Kingdom
  4. 4Top BusinessesHaan Coffee: Mills 50’s Korean-Inflected Roaster Tops Orlando Coffee
  5. 5ReviewsThe 10 Best Attractions & Things To Do in Orlando

Spotted an error? Tell us — corrections · How we rank

Derek Vance

Traffic & Roads reporter for Orlando Citizen. Covers I-4, toll roads, SunRail, Brightline and road projects from FDOT and FL511 official sources.