Traffic & Roads

SR 417 Traffic: SR 434 Southbound Ramps Close Overnight November 18 and 19 in Seminole County

For drivers along Seminole County's SR 417 corridor, full closures shut the southbound entrance and exit ramps at SR 434 (Exit 44) from 11:30 p.m. to 5:00 a.m. on Wednesday and Thursday nights, routing late-night traffic onto surface-street detours as a $300 million widening project presses south.

3 minute read

ShareFacebookX

A Seminole County driver reaching SR 434 after dinner tonight expecting an open run onto southbound SR 417 — or an open ramp off it — will find both ways barred once the late-night work begins. The southbound entrance and exit ramps at SR 434 (Exit 44) close in full overnight on Wednesday, November 18, and again on Thursday, November 19, according to the Florida’s Turnpike Enterprise weekly advisory dated November 13, 2026, checked by this desk at 06:30 on Wednesday. The shutdowns mark the southbound turn in an interchange sequence this desk has tracked all week, after the northbound ramps at SR 434 and the southbound ramp to Aloma Avenue took Monday and Tuesday nights; earlier dispatches appear in the Traffic & Roads archive and the beats index.

The windows: 11:30 p.m. to 5:00 a.m., two nights

Across consecutive nights, the southbound Seminole Expressway / SR 417 entrance and exit ramps to SR 434 (Exit 44) shut completely from 11:30 p.m. Wednesday, November 18, to 5:00 a.m. Thursday, November 19, and again from 11:30 p.m. Thursday, November 19, to 5:00 a.m. Friday, November 20. Those ramp closures sit inside a broader schedule of restrictions along the mainline and surface streets. On northbound and southbound SR 417 between south of Aloma Avenue and north of SR 434, single-lane closures run from 8:00 p.m. to 6:00 a.m. nightly through Thursday, paired with daytime shoulder closures from 10:00 a.m. to 3:00 p.m. through Friday. Underneath the expressway on those same 8:00 p.m. to 6:00 a.m. overnight hours, single-lane closures also narrow Aloma Avenue, Red Bug Lake Road, Winter Springs Boulevard and SR 434, leaving drivers in the Winter Springs corridor to navigate underpass work alongside the closed ramps above.

The detours, as the advisory posts them

SR 434 traffic wishing to access southbound SR 417 will be directed to Mitchell Hammock Road, then west along Mitchell Hammock Road to reach southbound SR 417.

Southbound SR 417 traffic wishing to access SR 434 (Exit 44) will be directed to exit at Red Bug Lake Road (Exit 41) and travel east on Red Bug Lake Road to connect with southbound SR 434.

What comes Thursday night at the same interchange

By Thursday night, the corridor tightens further as two additional full closures take effect on the same 11:30 p.m. Thursday to 5:00 a.m. Friday window. On the expressway, the southbound SR 417 exit ramp to Red Bug Lake Road (Exit 41) closes completely, sending drivers to exit at Aloma Avenue (Exit 38) and head east on Aloma Avenue to Red Bug Lake Road. Underneath SR 417 during those same hours, eastbound and westbound Slavia Road also closes in full, with the detours posted in the advisory routing traffic via Red Bug Lake Road and Aloma Avenue. Readers following how the week’s sequence has unfolded can consult this desk’s Tuesday-night ramp report, while Wednesday’s broader overnight picture is detailed in the Wednesday conditions report.

The project behind the closures

Behind each overnight detour is a multiyear reconstruction of SR 417 between Aloma Avenue and north of SR 434 in Seminole County, widening the expressway from four lanes to eight by adding two lanes in each direction, replacing five bridges and widening 12 existing bridges, along with new underdeck lighting, signage and pavement markings. Per the advisory, the work carries an approximate cost of $300 million and continues through late 2030, making this week’s ramp shutdowns part of a long horizon on the corridor.

Sources & notes

Source: Florida’s Turnpike Enterprise, Central and West Central Florida Weekly Lane Closures and Work Zone Advisory dated November 13, 2026 — Seminole Expressway / SR 417 Widening Project section (southbound SR 417 entrance and exit ramps to SR 434 (Exit 44): overnight full ramp closures 11:30 p.m. Wednesday, November 18, to 5:00 a.m. Thursday, November 19, and 11:30 p.m. Thursday, November 19, to 5:00 a.m. Friday, November 20, with detours as published; mainline single-lane and underpass patterns, Thursday-night Exit 41 and Slavia Road items, project description, late-2030 completion and approximate $300 million cost as published), read in full at this desk’s 06:30 check on Wednesday, November 18, 2026. FL511 presented its log-in prompt at the check; no incident is quoted from it. Photo: SR 417, the Seminole Expressway (GreeneWay), a file photo. Photo: East Park, CC BY 3.0, via Wikimedia Commons; magazine photo grade applied (featured image reused from this desk’s earlier SR 417 coverage).

Filed under · ·

Editor’s Picks

  1. 1NewsEpic Universe Faces Its First Holiday Season
  2. 2ReviewsThe 10 Best Coffee Shops in Orlando
  3. 3TourismMagic Kingdom
  4. 4Top BusinessesHaan Coffee: Mills 50’s Korean-Inflected Roaster Tops Orlando Coffee
  5. 5ReviewsThe 10 Best Attractions & Things To Do in Orlando

Spotted an error? Tell us — corrections · How we rank

Derek Vance

Traffic & Roads reporter for Orlando Citizen. Covers I-4, toll roads, SunRail, Brightline and road projects from FDOT and FL511 official sources.